Bukovec
City: Holýšov
Since: 2009
Power: 1 x 600 kW

approx. 50% solid manure

Dahlenburg
City: Dahlenburg
Since: 2007
Power: 3 x 500 kW

Satellite CHP unit, Heat use, Municipal utility company

Deblinghausen
City: Steyerberg
Since: 2012
Power: 2 x 400 kW

Direct commercialisation, Dried chicken faeces, Domestic heating grid

Götzberg
City: Henstedt
Since: 2007
Power: 1 x 549 kW

Dry fermentation, Heating of greenhouses and pig barns

Holterdorf
City: Melle
Since: 2010
Power: 2 x 190 kW

approx. 40% solid manure, Micro gas distribution system with satellite CHP unit in 600 m distance

Ihausen
City: Westerstede
Since: 2005
Power: 1 x 500 kW

The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel

Krukum (ATZ)
City: Melle
Since: 2010
Power: 2 x 370 kW 
1 x 210 kW 
1 x 150  kW 
2 x 400 kW 
3 x 530 kW

Micro gas distribution system with satellite CHP unit, District heating grid (heating school, open-air pool, church institutions), Wood carburettor

Linne
City: Bissendorf
Since: 2009
Power: 2 x 190 kW

Connection of barns and existing manure storages for input supply to the biogas plant, The biogas plant is almost solely operated with slurry.

Lünen
City: Lünen
Since: 2009
Power: 10 x 250 kW

Micro gas distribution system (length 6,5 km), 10 satellite-CHP units with 250 kWel each, enamelled Steel tanks, Operated by municipal utility company

Nonantola
City: Nonantola
Since: 2012
Power: 1 x 1000 kW
Randkanal Nord
City: Köln
Since: 2012
Power: 1 x 1.200 kW

Operated by utility company, Heat use

Redefin
City: Redefin
Since: 2008
Power: 2 x 250
1 x 550 
3 x 630 kW

Micro gas distribution system (17km), approx. 30% solid manure

Vettweiß
City: Vettweiß
Since: 2011
Power: 1 x 370 kW

Gas feed-in plant, Fermentation of sugar beets

Vinni
City: Lääne-Virumaa
Since: 2012
Power: 1 x 526
1 x 844 kW

Reference overview of biogas

Plant City Since Power Description
1 Ahe 27616 Kirchwistedt 2012 3800./2 x 1500
1 x 800 kW
2 Ahnikov 9999900670067CZ - 43001 Malkov 2012 600./1 x 600 kW

Waste processing plant

3 Ahnikov Erw. (CZ) 9999900840084Tschechien - 430 0 Ahnikov 2014 0./
4 Altranft 16259 Bad Freienwalde 2010 600./1 x 600 kW
5 Ardestorf 21614 Buxtehude 2011 526./2 x 250 kW
6 Aschersleben 06449 Aschersleben 2011 645./1 x 645 kW

Installation of our pre-fabricated technology module

 

7 Auegas Harsefeld 21698 Harsefeld 2010 750./1 x 500
1 x 250 kW
8 Bad Freienwalde 16259 Bad Freienwalde 2010 550./1 x 550 kW

Technology module

9 Baljerdorf 21730 Balje 2011 500./1 x 500 kW

Heating of farmstead and poultry barn, Pile foundation

10 Barl 32369 Rahden 2010 500./2 x 250 kW

Micro gas distribution system with satellite CHP unit, The input consists of 10% grass silage

11 Bartolfelde 37431 Bad Lauterberg 2011 720./1 x 220
2 x 250 kW
12 Barum 21357 Barum 2011 370./1 x 370 kW
13 Bawinkel 49844 Bawinkel 2013 250./1 x 250 kW

Gas management system

14 Behrendorf 25850 Behrendorf 2010 250./1 x 250 kW

The input consists of 20% grass silage

15 Beldorf 25557 Beldorf 2010 380./1 x 380 kW

Digestate drying, The input consists of 10% grass silage

16 Bellingen 39579 Bellingen 2011 265./1 x 265 kW
17 BERD 1 26892 Dörpum 2011 500./1 x 500 kW

Heating of barns

18 BERD 2 26892 Dörpen 2012 500./1 x 500 kW

Heating of barns

19 Biogas plant Berge 14641 Berge 2014 0./530 kWel
20 Bergzow 39307 Bergzow 2009 370./1 x 370 kW

Mixing tank and Hydrolysis

21 Beringstedt 25575 Beringstedt 2010 380./1 x 380 kW

The input consists of 5% grass silage

22 Bersenbrück 49593 Bersenbrück 2012 1./2 x 400
1 x 526 kW
23 Bovinzoo (IT) 9999900730073I - 47030 Borghi (FC) 2015 190./1x190kW
24 Braderup 25923 Braderup 2005 906./1 x 526 
2 x 190 kW

Heating of pig barns and several homes, 2009 upgrade to 716 kWel, 2010 upgrade to 906

25 Brekling 24881 Nübel 2007 500./1 x 500 kW

Heating of homes and barns, Dry fermentation

26 Bukovec 9999900670067CZ - 34562 Holýšov 2009 600./1 x 600 kW

approx. 50% solid manure

27 Bunsoh 25767 Bunsoh 2010 250./1 x 250 kW

The input consists of 5% grass silage

28 Burow 17089 Burow 2010 716./1 x 716 kW

Use of a Hammermill

29 Campegine 9999900730073I - 42040 Campegine 2012 250./1 x 250 kW
30 Castelleone 1 9999900730073I - 26012 Castelleone 2012 250./1 x 250 kW
31 Castelleone 2 9999900730073I - 26010 Fiesco 2012 250./1 x 250 kW
32 Christinenthal 25593 Christinenthal 2010 250./1 x 250 kW
33 Biogas plant Clapton 9999900710071GB - Somerset 2013 0./526
34 Biogas plant Copella 9999900850085UK - Suffolk 2014 499./499 kWel
35 Cremlingen 38162 Cremlingen 2011 600./1 x 600 kW

Wood drying

36 Cremlingen Extension 38162 Cremlingen 2017 704./1 x 704 kW
37 Dahlenburg 21368 Dahlenburg 2007 1500./3 x 500 kW

Satellite CHP unit, Heat use, Municipal utility company

38 Deblinghausen 31595 Steyerberg 2012 800./2 x 400 kW
39 Deinste 21717 Fredenbeck-Deinste 2011 940./1 x 370 
3 x 190 kW

Heating of barns and homes, heat grid

40 Deister 31848 Bad Münder 2011 1076./ 1 x 526 kW 
1 x 550 kW 

2017 upgrade from 526 kWel to 1076 kWel

41 Divjumi (LV) 9999900760076Lettland - 3022 Jelgavas novads 2014 600./600
42 Dörpum 25821 Bordelum 2007 625./1 x 625 kW

Heating of barns and homes, Joint operation by 8 farmers

43 Dörpum 2 25821 Bordelum 2010 500./2 x 250 kW

2011 upgrade to 500 kWel

44 Dossow 16909 Wittstock 2012 600./1 x 600 kW
45 Dratum 49326 Melle 2008 380./2 x 190 kW

Heating of farmstead and poultry barn

46 Dretzen 14793 Buckautal 2011 250./1 x 250 kW

digestate separation

47 Drevec 9999900670067CZ - 33141 Kožlany 2012 600./1 x 600 kW
48 Drochtersen 21706 Drochtersen 2009 537./1 x 537 kW

Installation of our pre-fabricated technology module

49 Ebbinghof 57392 Schmallenberg 2009 250./1 x 250 kW

Heat use in a hotel, Connection to existing heat grid operated with wood chip heating.

50 Biogas plant Edincik 9999900840084TR - 10640 Edincik 2014 0./2134 kWel
51 Eitzte 27446 Selsingen 2014 250./1 x 250 kW

The biogas plant is almost solely operated with slurry,

Heating of milking parlour and homes

52 Ellingstedt 42870 Ellingstedt 2005 500./1 x 500 kW
53 Elve 48336 Sassenberg 2010 190./1 x 190 kW
54 Embühren 24819 Embühren 2009 370./1 x 370 kW
55 Emsdetten 48282 Emsdetten 2013 637./1 x 637 kW
56 Energiepark Neuenwege 26316 Varel 2011 860./1 x 220
1 x 190
1 x 450 kW

The input consists of 10 % grass silage,

Gravity overflow

57 Esperstoft 24887 Silberstedt 2006 500./1 x 500 kW
58 Exeler 48432 Rheine 2015 1310./2 x 530 kW 
1 x 250 kW

2017 upgrade from 780 kWel to 1310 kWel

59 Falkenhain 04808 Falkenhain 2012 265./1 x 265 kW
60 Faulenhofe 21730 Balje 2011 560./1 x 370 
1 x 190 kW

Heating of chicken barns

61 Finale Emilia 9999900730073I - 41035 Finale Emilia 2004 250./1 x 250 kW

First biogas plant built in Italy

62 Friedrichsau 24855 Jübek 2011 600./1 x 600 kW

Digestate drying

63 Füchtorf 48336 Sassendorf 2011 250./1 x 250 kW
64 Garze 21354 Bleckede 2009 190./1 x 190 kW

Gravity overflow

65 Goldelund 25862 Goldelund 2010 869./1 x 499 
1 x 370 kW
66 Gonzaga (IT) 9999900730073I - 46020 Palidano di Gonzaga (MN) 2015 265./1x265kW
67 Götzberg 24558 Henstedt 2007 549./1 x 549 kW

Dry fermentation, Heating of greenhouses and pig barns

68 Grasberg 28879 Grasberg 2013 515./1 x 250
1 x 265 kW
69 Groß Bäbelin 18292 Groß Bäbelin 2001 160./1 x 160 kW

Heating of homes, recreation rooms and pig barns

70 Großenwiehe 24969 Großenwiehe 2007 1250./2 x 625 kW

Delivery of heat to the community and to a forwarding agency for cleaning tanks, Operation of a drying plant to reduce the amount of digestate

71 Gültz 17089 Gültz 2011 600./1 x 600 kW

Technology module

72 Gut Böckel 32289 Rödinghausen 2010 600./1 x 600 kW

Heating of an estate

73 Gut Wiede 31609 Balge 2012 400./1 x 400 kW

Heating of a school

74 Hahausen Extension 38729 Hahausen 2017 530./1 x 530 kW

Extension of existing biogas plant by a CHP

75 Hammrich 26632 Ihlow 2011 650./1 x 250 
1 x 400 kW

Gravity overflow, The input consists of 10% grass silage, Satellite CHP unit

76 Hamweddel 24816 Hamweddel 2007 625./1 x 625 kW
77 Handrup 9999900680068Deutschland - 49383 Handrup 2012 265./265
78 Harsefeld 21698 Harsefeld 2011 1010./1 x 190 
1 x 370
1 x 450 kW

2012 upgrade to 1.010 kWel

79 Harsewinkel 33428 Harsewinkel 2012 265./1 x 265 kW
80 Havendorf 26954 Nordenham 2011 370./1 x 370 kW 
1 x 530 kW

Use of a Hammermill, 2016 upgrade to 900 kW

81 Heede 9999900680068Deutschland - 26892 Heede, Kreis Emsland 2011 400./400
82 Heinersdorf 15518 Steinhöfel OT Heinersdorf 2015 800./2 x 400 kW
83 Heitzhausen 9999900680068Deutschland - 27243 Winkelsett 2013 265./265
84 Het Haantje 9999900780078NL - 7847 Het Haantje 2009 6520./2 x 2.730 
1 x 1.060 kW

Power sale on the energy stock market, Load management, Digestate processing with ultra filtration

85 Hingste 27318 Hoya 2012 520./1 x 265 kW 
1 x 255 kW

Heat use by neighbouring industrial enterprises, 2016 upgrade from 265 kWel to 520 kWel

86 Hödingen 39356 Hödingen 2014 740./1 x 340 kW 
1 x 400 kW

2016 upgrade from 340 kWel to 740 kWel

87 Hohengören 39524 Hohengören 2012 265./1 x 265 kW
88 Hohenziatz 39291 Hohenziatz 2010 536./1 x 536 kW

Mixing tank

89 Holte 31613 Wietzen 2012 776./1 x 250
1 x 526 kW

Heat use by Wiesenhof company

 

90 Holterdorf 49326 Melle 2010 380./2 x 190 kW

approx. 40% solid manure, Micro gas distribution system with satellite CHP unit in 600 m distance

91 Holzhausen 16866 Kyritz 2009 537./1 x 537 kW

Installation of our pre-fabricated technology module

92 Horstedt 25860 Horstedt 2006 500./1 x 500 kW

Separation of input material before the digestion,

Dry fermentation, Heating of barns and homes

93 Hoxfeld 46325 Borken 2004 1100./1 x 1.100 kW

Waste processing plant, Vapourisation of feedstock for micro-gas turbine, Hydrolysis and hygienisation

94 Hoya 27318 Hoya 2008 500./1 x 500 kW

Production heat for neighbouring industrial enterprises

95 Hroby 9999900670067CZ - 39001 Tábor 2014 550./1 x 550 kW
96 Hübitz 06308 Hübitz 2014 500./2 x 250 kW

Digestate drying, Digestate separation

97 Hunteburg 49328 Bohmte-Hunteburg 2013 265./1 x 265 kW
98 Hustädte 49328 Melle 2001 250./1 x 250 kW

Plug-flow-fermenter with gas attached gas accumulator - PLC controlled with visualisation, Separate receiving hall, External desulphurisation in a cross-current process

99 Ihausen 26655 Westerstede 2005 500./1 x 500 kW

The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel

100 Ihlowerfehn 26632 Ihlowerfehn 2006 976./1 x 526
1 x 450 kW

Joint operation by farmer and BioConstruct, Supply of municipal property, Mono-fermentation of energy crops, 2011 upgrade to 976 kWel

101 Imperial Park 9999900710071GB - Middlesbrough 2017 4988./3 x 1.487 kW 
1 x 527 kW

Waste processing plant

102 Itzstedt 23845 Itzstedt 2009 815./1 x 190 
1 x 625 kW

Heat supply for a research centre by sattelite CHP unit

103 Jeggeleben 39624 Jeggeleben 2013 265./1 x 265 kW
104 Jevenstedt 24808 Jevenstedt 2009 370./1 x 370 kW
105 Kaarßen 19273 Amt Neuhaus 2005 2840./2 x 1.420 kW

Production of manure concentrate by vapourising final feedstock , Complete use of thermal heat, Co-financing and operation of the plant by BioConstruct

106 Biogas plant Kaarßen 2 19273 Kaarßen 2014 0./530 kWel

geruchsdichtes Dach

107 Kappeln 24376 Kappeln 2011 1034./1 x 190 
1 x 844 kW

Micro gas distribution system with satellite CHP unit

108 Karaman 9999900840084TR - 70000 Karaman 2015 1414./1 x 1.414 kW
109 Kent 9999900710071GB - Chart Sutton, Maidstone 2016 250./1 x 250 kW
110 Klecken 21224 Rosengarten-Klecken 2012 500./1 x 350
1 x 150 kW

Heating of greenhouses, Satellite CHP unit

111 Klein-Offenseth 25365 Klein-Offenseth-Sparrieshoop 2007 1151./1 x 526 
1 x 625 kW

Micro-gas distribution system with satellite-CHP, Heating of greenhouses, 2007: upgrade from 526 kWel to 1,151 kWel

112 Kleinburgwedel 30938 Burgwedel 2013 920./2 x 460 kW
113 Klostergut Loccum 31547 Rehburg-Loccum 2011 780./1 x 400 
2 x 190 kW
114 Kolbow 19300 Kolbow 2011 600./1 x 600 kW
115 Krátošice 9999900670067CZ - 39201 Sobeslav 2012 536./1 x 536 kW
116 Biogas plant Kremmen 16766 Kremmen 2014 0./265 kWel
117 Krukum (ATZ) 49328 Melle 2010 1080./2 x 370 kW 
1 x 210 kW 
1 x 150  kW 
2 x 400 kW 
3 x 530 kW

 

 

118 Labbeck 47665 Sonsbeck 2011 255./1 x 255 kW

Gravity overflow, Dual-fuel CHP unit

 

 

119 Biogas plant Langenweddingen 39171 Langenweddingen 2014 0./220
120 Lebach 66822 Lebach 2011 1245./3 x 265
1 x 450 kW

Heating of a home and supply of municipal property (hospital, school centre)

121 Leffincourt 9999900700070FR - 08310 Machault 2016 250./1 x 250 kW
122 Libur 51147 Köln-Porz 2007 500./1 x 500 kW

Bulk goods drying

123 Linne 49143 Bissendorf 2009 380./2 x 190 kW

Connection of barns and existing manure storages for input supply to the biogas plant, The biogas plant is almost solely operated with slurry.

124 Loukovec 9999900670067CZ - 29413 Chocnejovice 2011 1000./1 x 400 
1 x 600 kW

Heating of homes and barns

125 Lünen 44532 Lünen 2009 2500./10 x 250 kW

Micro gas distribution system (length 6,5 km), 10 satellite-CHP units with 250 kWel each, enamelled Steel tanks, Operated by municipal utility company

126 Lütjenwestedt 25585 Lütjenwestedt 2009 370./1 x 370 kW
127 Marren 49699 Lindern 2014 250./1 x 250 kW
128 Meden Vale 9999900710071GB - Meden Vale, Mansfield, Nottinghamshire 2016 355./1 x 355 kW

1.000 Nm³ gas feed-in plant

129 Mirandola 9999900730073I - 41037 Mirandola 2012 800./1 x 800 kW

Dry fermentation, Separation, Technology module

130 Mirow 17252 Mirow 2014 1069./1 x 255 kW 
1 x 265 kW 
1 x 549 kW
131 Mühlenweg 25899 Klixbüll 2011 620./1 x 370 
1 x 250 kW
132 Neerstedt 27801 Neerstedt 2011 716./1 x 190 
1 x 526 kW
133 Neese 19300 Neese 2008 500./1 x 500 kW

Installation of our pre-fabricated technology module

134 Biogas plant Neu Jabel 19303 Woosmer 2014 0./190 kWel
135 Neukammer 1 14641 Nauen 2009 1074./2 x 537 kW

Modification and expansion of existing biogas plant from 537 kWel to 2 x 537 kWel, 2 km local heat grid to a local hospital

136 Neukammer 2 14641 Nauen 2011 2500./1 x 2.500 kW
137 Nonantola 9999900730073I - 41015 Nonantola 2012 1000./1 x 1000 kW
138 Norderende 24887 Silberstedt 2011 1075./1 x 526 kW
1 x 549 kW

The input consists of 5% grass silage, 2017 upgrade from 526 kWel to 1075 kWel

139 Nortorf 24589 Schülp 2010 620./1 x 370 
1 x 250 kW

Satellite CHP unit, Digestate drying

140 Nutteln 32369 Rahden 2010 250./1 x 250 kW

Heating system fort he supply of homes and crafts enterprises, Joint operation by farmer and BioConstruct

141 Oehna 14913 Niedergöhrsdorf 2009 537./1 x 537 kW

Operated by utility company, Installation of our pre-fabricated technology module, digestate separation (in planning)

142 Oelde 59302 Oelde 2011 760./4 x 190 kW

Micro gas distribution system with satellite CHP unit

143 Oisu 9999900690069EE - 7230 Väljaotsa küla,Türi vald 2013 1130./  1 x 1.130  kW
144 Oster-Ohrstedt 25885 Oster-Ohrstedt 2010 250./1 x 250 kW

The input consists of 15% grass silage

145 Ostercadewisch 21789 Wingst 2011 625./1 x 625 kW

Heating system fort he supply of a market garden

146 Osterstedt 25590 Osterstedt 2009 190./1 x 190 kW
147 Ostuffeln 59457 Werl 2010 250./1 x 250 kW

Heat use by residence of St. Josef der von Mellin foundation, The input consists of 5% grass silage

148 Parey 39317 Elbe-Parey 2009 250./1 x 250 kW

Mixing tank and Hydrolysis

149 Pasel 58840 Plettenberg 2013 250./1 x 250 kW
150 Peckfitz 9999900680068Deutschland - 39649 Peckfitz, Altmarkkreis Salzwedel 2014 265./265
151 Pleše 9999900670067CZ - 37821 Kardašova 2010 537./1 x 537  kW

Fermenter und Nachgärer sind parallel über einen Feststoffeintrag beschickbar, Anmischgrube mit Entnahmestation, Vergärung von 5% Grassilage und 5% Festmistanteil

152 Polenzko 39264 Polenzko 2008 530./2 x 265 kW

Hydrolysis, Local heat grid to supply several homes, Dual-fuel CHP unit

153 Potzwenden 37136 Landolfshausen 2014 190./1 x 190 kW
154 Randkanal Nord 50769 Köln 2012 1200./1 x 1.200 kW

Operated by utility company, Heat use

155 Rapotin 9999900670067CZ - 78814 Rapotin 2016 0./1 x 405 kW 
1 x 500 kW

Waste processing plant

156 Redefin 19230 Redefin 2008 2940./2 x 250
1 x 550 
3 x 630 kW

Micro gas distribution system (17km), approx. 30% solid manure, Dry fermentation, Joint operation

157 Biogas plant Reesdorf 14547 Reesdorf 2014 0./250 kWel
158 Reetz 14827 Wiesenburg OT Reetz 2013 400./1 x 400 kW

Reine Gülleanlage

159 Reher 25593 Reher 2007 625./1 x 625 kW
160 Reichenbach 09648 Kriebstein 2008 500./1 x 500 kW

Heating of homes and barns

161 Ribbeck 14641 Nauen 2010 370./1 x 370 kW

Installation of our pre-fabricated technology module, Gravity overflow, digestate separation, Heat use (in planning)

162 Rieste 49597 Rieste 2003 520./1 x 520 kW

Waste processing plant, 2005: upgrade from 340 kWel to 520 kWel

163 Rodewald 31637 Rodewald 2011 500./2 x 250  kW
164 Rothemann 36124 Eichenzell 2010 250./1 x 250 kW
165 Biogas plant Ruhlsdorf 14947 Nuthe-Urstromtal 2014 0./250 kWel
166 Salzwedel Biomethan BHKW 29410 Salzwedel 2012 2378./2 x 1.189 kW

2013 upgrade to 2.378 kWel

167 Schöninghsdorf 49767 Twist 2010 526./1 x 526 kW

Heating of broiler barns, Separation

168 Schreiersort 26434 Wangerland 2011 850./1 x 370 
1 x 480 kW

Digestate drying, The input consists of 35% grass silage

169 Schuby 24850 Schuby 2004 3906./2 x 500 kW 
2 x 549 kW
2 x 904 kW

Installation of an innovative mixing technology for homogenising slurry and energy crops before feeding the fermenter (Quickmix®), 2016 upgrade from 1.000 kWel to 3.906 kWel

170 Schuby 2 24850 Schuby 2007 500./1 x 500 kW

Heating of barns and homes

171 Schülp 24813 Schülp 2009 620./1 x 370 
1 x 250  kW
172 Schwagstorf 49179 Ostercappeln 2010 500./2 x 250 kW

2012 upgrade to 500 kWel

173 Schwege 49219 Glandorf 2011 250./1 x 250 kW
174 Sechtem 53332 Bornheim 2007 500./1 x 500 kW

Heating of a home and greenhouses

175 Seeverns 26969 Butjadingen 2011 750./1 x 250 
1 x 500 kW

2012 upgrade to 750 kWel and digestate separation

176 Siedenbollentin 17089 Siedenbollentin 2006 500./1 x 500 kW

Heating of barn and farm building

177 Siegersleben 39365 Siegersleben 2014 845./1 x 180 
1 x 250 
1 x 400  kW
178 Silberstedt 24887 Silberstedt 2006 1887./2 x 625
1 x 637 kW

2008: upgrade from 625 kWel to 1,250 kWel, 2012: upgrade from 1,250 kWel to 1,887 kWel, Drying wood chippings

179 Sochos 9999900710071GR - 57002 Sochos 2016 999./1 x 999 kW
180 Sotterhausen 06528 Sotterhausen 2014 800./2 x 400 kW
181 Spradow 32257 Bünde 2014 500./2 x 250 kW
182 Springe 31832 Springe 2012 1050./2 x 525 kW
183 Staffhorst 27254 Staffhorst 2010 750./3 x 250 kW

2012 upgrade to 500 kWel

2013 upgrade to 750 kWel

184 Staffordshire 9999900710071GB - Staffordshire 2016 249./1 x 249 kW
185 Stankov 9999900670067CZ - 34561 Stankov 2012 550./1 x 550 kW
186 Sterup 24996 Sterup 2010 716./1 x 716 kW

Installation of our pre-fabricated technology module, The input consists of 5% grass silage

187 Strasburger Landgesellschaft 27432 Bevern 2012 515./1 x 265
1 x 250 kW
188 Strohe 27243 Colnrade 2011 560./1 x 560 kW

Micro gas distribution system with satellite CHP unit, Wood drying

 

189 Strunkovice 9999900670067CZ - 38301 Prachatice 2014 550./1 x 550 kW
190 Stumpenhausen 31613 Wietzen 2010 500./1 x 500 kW
191 Teesside 9999900710071GB - Middlesbrough 2015 5098./3 x 1487 kW 
1 x 637 kW

Waste processing plant

192 Telford 9999900710071GB - Telford, Shropshire 2016 499./1 x 499
193 Tespe 21395 Tespe 2008 500./1 x 500 kW

Pile foundation for the tanks, Joint operation by farmer and BioConstruct, complete thermal utilisation through wood drying

194 Tjuchem 9999900780078NL - 9939 Tjuchem 2010 600./1 x 600 kW
195 Tripkau 19273 Amt Neuhaus 2006 716./1 x 716 kW

2007: upgrade from 500 kWel to 716 kWel, Since 2009: Local heat grid into town to supply several homes

196 Usilov 9999900670067CZ - 34506 Usilov 2012 600./1 x 600 kW
197 Varl 32269 Rhaden 2010 500./2 x 250 kW

2012 upgrade to 500 kWel

198 Vettweiß 52391 Vettweiß 2011 370./1 x 370 kW
199 Viadana 9999900730073I - 46019 Viadana 2012 1000./1 x 1.000 kW
200 Biogas plant Vielank 19303 Vielank 2014 0./530 kWel
201 Vinni 9999900690069EE - 46601 Lääne-Virumaa 2012 1370./1 x 526
1 x 844 kW
202 Volkringhausen 58802 Balve 2009 500./2 x 250 kW

Heating of homes and barns

203 Vörden 49434 Neuenkirchen-Vörden 2010 500./1 x 500 kW

Connection of barns for input supply to the biogas plant, The biogas plant is almost solely operated with slurry

204 Výškov 9999900670067CZ - 44001 Louny 2012 600./1 x 600 kW
205 Waffensen 27356 Rotenburg / Wümme 2014 1173./1 x 536 kW 
1 x 637 kW

2016 upgrade from 536 kWel to 1173 kWel

206 Wappingthorn Farm 9999900710071GB - BN443 West Sussex 2015 499./1 x 499 kW
207 Westerende 26632 Ihlow 2007 500./1 x 500 kW

Dry fermentation

208 Wetter 49328 Melle 2009 190./1 x 190 kW

Wood drying

209 Wietzen 31613 Wietzen 2006 500./1 x 500 kW

Heating of barns and homes, Supply of municipal property, Dry fermentation

210 Winnert 25887 Winnert 2006 500./1 x 500 kW

Heating of barns and homes

211 Winzlar 31547 Rehburg-Loccum 2013 250./1 x 250 kW
212 Wissen Erw. 9999900680068Deutschland - 47652 Weeze 2011 526./526
213 Wittkiel 24409 Stoltebüll 2006 791./1 x 526 
1 x 265 kW

Heating of pig barns and several holiday homes, Drying wood chippings, 2008: upgrade from 526 kWel to 791 kWel

214 Wredenhagen 9999900680068Deutschland - 17209 Wredenhagen 2014 800./800
215 Wremen 27638 Samtgemeinde Wursten 2007 500./1 x 500 kW

Wood drying for pellet production

216 Wremen Erweiterung 9999900680068Deutschland - 27607 Sievern, Landkreis Cuxhaven 2014 370./370
217 Zabovresky 9999900670067CZ - 25601 Benešov 2012 526./1 x 526 kW
218 Zens 9999900680068Deutschland - 39221 Zens 2014 889./889