Biogas plant Braderup

Services provided

Implementation planning 
General contracting 
Initial operation / trial run

Type of plant

Fermentation of slurry and energy crops

Location

Braderup, Kreis Nordfriesland, Schleswig-Holstein, Germany

Initial operation

IV. quarter 2005

Operation process

2-stage - two fermenters with parallel fermentation, one of them can be used as a secondary fermenter

Temperature range

mesophilic

Fermenter

2 x 2.217 m³

Feedstock

Pig slurry
Cattle slurry
Maize silage

Total

7.000 t/a
3.000 t/a
10.000 t/a

20.000 t/a

Gas utilisation

Type 
Power electr.

1 x gas-CHP
500 kWel

Energy production

electrical

4.000.000 kWhel
-> requirements of 1000 households

thermal

4.000.000 kWh
-> equivalent to 400.000 l heating oil

Use of thermal energy

Heating of pig sheds and several houses