Biogas plant Winnert

Services provided

Project development
Authorisation planning
Implementation planning
General contracting
Initial operation / trial run

Type of plant

Agricultural Biogas Plant 

Location

Winnert, Kreis Nordfriesland, Schleswig-Holstein, Germany

Initial operation

IV. quarter 2006

Operation process

2-stage - two parallel fermenters to feed, one of them can also be used as a secondary fermenter

Temperature range

mesophilic

Fermenter

1 x 2.010 m³

Secondary fermenter

1 x 2.010 m³

Final storage tank

2 x 4.000 m³

Feedstock

Solid matter of separated cattle slurry
maize silage
Total


1.200 t/a
10.200 t/a
11.400 t/a

Gas utilisation

Type 
Power electr.

1 x gas-CHP
500 kWel

Energy production

electrical


thermal

4.000.000 kWhel
-> requirements of 1000 households
4.000.000 kWh
-> equivalent to 400.000 l heating fuel

Use of thermal energy

Heating of sheds and houses

Location