Reference Plants BioConstruct

Tip: You can re-sort the table by clicking the headlines.

Biogas Plant City Since Power Description
Bergzow 39307 Bergzow 2009 370./1 x 370 Mixing tank and Hydrolysis
Braderup 25923 Braderup 2005 906./1 x 526 
2 x 190
Heating of pig barns and several homes, 2009 upgrade to 716 kWel, 2010 upgrade to 906
Brekling 24881 Nübel 2007 500./1 x 500 Heating of homes and barns, Dry fermentation
Dörpum 25821 Bordelum 2007 625./1 x 625 Heating of barns and homes, Joint operation by 8 farmers
Drochtersen 21706 Drochtersen 2009 537./1 x 537 Installation of our pre-fabricated technology module
Ebbinghof 57392 Schmallenberg 2009 250./1 x 250 Heat use in a hotel, Connection to existing heat grid operated with wood chip heating.
Ellingstedt 42870 Ellingstedt 2005 500./1 x 500
Embühren 24819 Embühren 2009 370./1 x 370
Esperstoft 24887 Silberstedt 2006 500./1 x 500
Garze 21354 Bleckede 2009 190./1 x 190 Gravity overflow
Götzberg 24558 Henstedt 2007 549./1 x 549 Dry fermentation, Heating of greenhouses and pig barns
Groß Bäbelin 18292 Groß Bäbelin 2002 160./1 x 160 Heating of homes, recreation rooms and pig barns
Hamweddel 24816 Hamweddel 2007 625./1 x 625
Holzhausen 16866 Kyritz 2010 537./1 x 537 Installation of our pre-fabricated technology module
Horstedt 25860 Horstedt 2006 500./1 x 500 Separation of input material before the digestion, Dry fermentation, Heating of barns and homes
Hoxfeld 46325 Borken 2005 1100./1 x 1.100 Waste processing plant, Vapourisation of feedstock for micro-gas turbine, Hydrolysis and hygienisation
Ihausen 26655 Westerstede 2005 500./1 x 500 The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel
Bukovec 34562 Holýšov 2009 600./1 x 600 approx. 50% solid manure
Hoya 27318 Hoya 2008 500./1 x 500 Production heat for neighbouring industrial enterprises
Hustädte 49328 Melle 2001 250./1 x 250 Plug-flow-fermenter with gas attached gas accumulator - PLC controlled with visualisation, Separate receiving hall, External desulphurisation in a cross-current process
Ihlowerfehn 26632 Ihlowerfehn 2006 500./1 x 500 Joint operation by farmer and BioConstruct, Supply of municipal property, Mono-fermentation of energy crops
Jevenstedt 24808 Jevenstedt 2009 370./1 x 370
Itzstedt 23845 Itzstedt 2009 815./1 x 190 
1 x 625
Heat supply for a research centre by sattelite CHP unit
Oehna 14913 Niedergöhrsdorf 2009 537./1 x 537 Operated by utility company, Installation of our pre-fabricated technology module, digestate separation (in planning)
Kaarßen 19273 Amt Neuhaus 2005 2840./2 x 1.420 Production of manure concentrate by vapourising final feedstock , Complete use of thermal heat, Co-financing and operation of the plant by BioConstruct
Klein-Offenseth 25365 Klein-Offenseth-Sparrieshoop 2007 1151./1 x 526 
1 x 625
Micro-gas distribution system with satellite-CHP, Heating of greenhouses, 2007: upgrade from 526 kWel to 1,151 kWel
Libur 51147 Köln-Porz 2008 500./1 x 500 Bulk goods drying
Linne 49143 Bissendorf 2009 190./1 x 190 Connection of barns and existing manure storages for input supply to the biogas plant, The biogas plant is almost solely operated with slurry.
Lütjenwestedt 25585 Lütjenwestedt 2009 370./1 x 370
Neese 19300 Neese 2009 500./1 x 500 Installation of our pre-fabricated technology module
Neukammer 1 14641 Nauen 2009 1074./2 x 537 Modification and expansion of existing biogas plant from 537 kWel to 2 x 537 kWel, 2 km local heat grid to a local hospital
Osterstedt 25590 Osterstedt 2009 190./1 x 190
Parey 39317 Elbe-Parey 2009 250./1 x 250 Mixing tank and Hydrolysis
Redefin 19230 Redefin 2008 500./1 x 500 Installation of our pre-fabricated technology module, Joint operation by farmer and BioConstruct
Reher 25593 Reher 2007 625./1 x 625
Reichenbach 09648 Kriebstein 2008 500./1 x 500 Heating of homes and barns
Rieste 49597 Rieste 2003 520./1 x 520 Waste processing plant, 2005: upgrade from 340 kWel to 520 kWel
Schuby 24850 Schuby 2004 1000./2 x 500 Installation of an innovative mixing technology for homogenising slurry and energy crops before feeding the fermenter (Quickmix®)
Schuby 2 24850 Schuby 2007 500./1 x 500 Heating of barns and homes
Schülp 24813 Schülp 2009 620./1 x 370 
1 x 250 
Sechtem 53332 Bornheim 2007 500./1 x 500 Heating of a home and greenhouses
Siedenbollentin 17089 Siedenbollentin 2006 500./1 x 500 Heating of barn and farm building
Silberstedt 24887 Silberstedt 2007 1250./2 x 625 2008: upgrade from 625 kWel to 1,250 kWel, Drying wood chippings
Tespe 21395 Tespe 2009 500./1 x 500 Pile foundation for the tanks, Joint operation by farmer and BioConstruct, complete thermal utilisation through wood drying
Tripkau 19273 Amt Neuhaus 2006 716./1 x 716 2007: upgrade from 500 kWel to 716 kWel, Since 2009: Local heat grid into town to supply several homes
Volkringhausen 58802 Balve 2009 250./1 x 250 Heating of homes and barns
Westerende 26632 Ihlow 2008 500./1 x 500 Dry fermentation
Wietzen 31613 Wietzen 2006 500./1 x 500 Heating of barns and homes, Supply of municipal property, Dry fermentation
Winnert 25887 Winnert 2006 500./1 x 500 Heating of barns and homes
Wittkiel 24409 Stoltebüll 2006 791./1 x 526 
1 x 265
Heating of pig barns and several holiday homes, Drying wood chippings, 2008: upgrade from 526 kWel to 791 kWel
Wremen 27638 Samtgemeinde Wursten 2007 500./1 x 500 Wood drying for pellet production
Dahlenburg 21368 Dahlenburg 2007 1500./3 x 500 Satellite CHP unit, Heat use, Municipal utility company
Großenwiehe 24969 Großenwiehe 2008 1250./2 x 625 Delivery of heat to the community and to a forwarding agency for cleaning tanks, Operation of a drying plant to reduce the amount of digestate
Het Haantje 7847 Het Haantje 2009 6520./2 x 2.730 
1 x 1.060
Power sale on the energy stock market, Load management, Digestate processing with ultra filtration
Polenzko 39264 Polenzko 2008 530./2 x 265 Hydrolysis, Local heat grid to supply several homes, Dual-fuel CHP unit
Lünen 44532 Lünen 2009 2500./10 x 250 Micro gas distribution system (length 6,5 km), 10 satellite-CHP units with 250 kWel each, enamelled Steel tanks, Operated by municipal utility company
Dratum 49326 Melle 2008 380./2 x 190 Heating of farmstead and poultry barn
Barl 32369 Rahden 2010 500./2 x 250 Micro gas distribution system with satellite CHP unit, The input consists of 10% grass silage
Beldorf 25557 Beldorf 2010 380./1 x 380 Digestate drying, The input consists of 10% grass silage
Behrendorf 25850 Behrendorf 2010 250./1 x 250 The input consists of 20% grass silage
Beringstedt 25575 Beringstedt 2010 380./1 x 380 The input consists of 5% grass silage
Bunsoh 25767 Bunsoh 2010 250./1 x 250 The input consists of 5% grass silage
Gut Böckel 32289 Rödinghausen 2010 600./1 x 600 Heating of an estate
Nutteln 32369 Rahden 2010 250./1 x 250 Heating system fort he supply of homes and crafts enterprises, Joint operation by farmer and BioConstruct
Oster-Ohrstedt 25885 Oster-Ohrstedt 2010 250./1 x 250 The input consists of 15% grass silage
Ostuffeln 59457 Werl 2010 250./1 x 250 Heat use by residence of St. Josef der von Mellin foundation, The input consists of 5% grass silage
Schöninghsdorf 49767 Twist 2010 526./1 x 526 Heating of broiler barns, Separation
Sterup 24996 Sterup 2010 716./1 x 716 Installation of our pre-fabricated technology module, The input consists of 5% grass silage
Wetter 49328 Melle 2009 190./1 x 190 Wood drying
Pleše 37821 Kardašova 2010 537./1 x 537  Fermenter und Nachgärer sind parallel über einen Feststoffeintrag beschickbar, Anmischgrube mit Entnahmestation, Vergärung von 5% Grassilage und 5% Festmistanteil
Altranft 16259 Bad Freienwalde 2010 600./1 x 600
Burow 17089 Burow 2010 716./1 x 716
Christinenthal 25593 Christinenthal 2010 250./1 x 250
Dörpum 2 25821 Bordelum 2010 250./1 x 250
Elve 48336 Sassendorf 2010 190./1 x 190
Finale Emilia 41035 Finale Emilia 2004 250./1 x 250 First biogas plant built in Italy
Hohenziatz 39291 Hohenziatz 2010 536./1 x 536
Holterdorf 49326 Melle 2010 380./2 x 190
Nortorf 24589 Schülp 2010 620./1 x 370 
1 x 250
Satellite CHP unit, Digestate drying
Ribbeck 14641 Nauen 2010 370./1 x 370 Installation of our pre-fabricated technology module, Gravity overflow, digestate separation, Heat use (in planning)
Schwagstorf 49179 Ostercappeln 2010 250./1 x 250 kW
Staffhorst 27254 Staffhorst 2010 250./1 x 250
Tjuchem 9939 Tjuchem 2011 600./1 x 600
Varl 32269 Rhaden 2010 250./1 x 250
Vörden 49434 Neuenkirchen-Vörden 2010 500./1 x 500 Connection of barns for input supply to the biogas plant, The biogas plant is almost solely operated with slurry
Norderende 24887 Silberstedt 2011 526./1 x 526 The input consists of 5% grass silage
Labbeck 47665 Sonsbeck 2011 255./1 x 255 Gravity overflow, Dual-fuel CHP unit
Kappeln 24376 Kappeln 2011 1034./1 x 190 
1 x 844
Micro gas distribution system with satellite CHP unit
Auegas Harsefeld 21698 Harsefeld 2010 500./1 x 500
Friedrichsau 24855 Jübek 2011 600./1 x 600 Digestate drying
Goldelund 25862 Goldelund 2011 499./1 x 499
Rothemann 36124 Eichenzell 2010 250./1 x 250
Stumpenhausen 31613 Wietzen 2010 500./1 x 500
Aschersleben 06449 Aschersleben 2011 645./1 x 645 Installation of our pre-fabricated technology module
Dretzen 14793 Buckautal 2011 250./1 x 250 digestate separation
Füchtorf 48336 Sassendorf 2011 250./1 x 250
Havendorf 26954 Nordenham 2011 370./1 x 370
Krukum 49328 Melle 2010 1080./2 x 370 
1 x 190 
1 x 150 
Neukammer 2 14641 Nauen 2011 2500./1 x 2.500
Oelde 59302 Oelde 2011 570./3 x 190 Micro gas distribution system with satellite CHP unit
Strohe 27243 Colnrade 2011 560./1 x 560 Micro gas distribution system with satellite CHP unit, Wood drying