Biogas plant Groß Bäbelin

Services provided

Implementation planning 
General contracting 
Initial operation / trial run

Type of plant

Agricultural Biogas Plant with energy crops

Location

Groß Bäbelin, Kreis Güstrow, Mecklenburg-Vorpommern, Germany

Initial operation

I. quarter 2002

Operation process

1-stage -
fully mixed, standing concrete fermenter with a discharge process

Temperature range

mesophilic

Fermenter

1 x 1.280 m³

Final storage tank

1 x 5.000 m³

Feedstock

Pig slurry
Rye silage

Total

7.300 t/a
2.100 t/a

9.400 t/a

Gas utilisation

Type
Power electr.

1 x fire ray CHP
160 kWel

Energy production

electrical

thermal

400.000 kWhel
-> requirements of 300 households
400.000 kWh
-> equivalent to 40.000 l heating oil

Use of thermal energy

Heating of houses, social rooms and pig sheds

Special features

CHP in container
PLC control with visualisation

Location