Reference Plants BioConstruct

Tip: You can re-sort the table by clicking the headlines.

Biogas Plant City Since Power Description
1 Braderup 25923 Braderup 2005 906./1 x 526 
2 x 190
Heating of pig barns and several homes, 2009 upgrade to 716 kWel, 2010 upgrade to 906
2 Ihausen 26655 Westerstede 2005 500./1 x 500 The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel
3 Klein-Offenseth 25365 Klein-Offenseth-Sparrieshoop 2007 1151./1 x 526 
1 x 625
Micro-gas distribution system with satellite-CHP, Heating of greenhouses, 2007: upgrade from 526 kWel to 1,151 kWel
4 Neukammer 1 14641 Nauen 2009 1074./2 x 537 Modification and expansion of existing biogas plant from 537 kWel to 2 x 537 kWel, 2 km local heat grid to a local hospital
5 Rieste 49597 Rieste 2003 520./1 x 520 Waste processing plant, 2005: upgrade from 340 kWel to 520 kWel
6 Silberstedt 24887 Silberstedt 2007 1887./2 x 625
1 x 637
2008: upgrade from 625 kWel to 1,250 kWel, 2012: upgrade from 1,250 kWel to 1,887 kWel, Drying wood chippings
7 Tripkau 19273 Amt Neuhaus 2006 716./1 x 716 2007: upgrade from 500 kWel to 716 kWel, Since 2009: Local heat grid into town to supply several homes
8 Wittkiel 24409 Stoltebüll 2006 791./1 x 526 
1 x 265
Heating of pig barns and several holiday homes, Drying wood chippings, 2008: upgrade from 526 kWel to 791 kWel