Biogas plant Bukovec
City: Holýšov
Since: 2009
Power: 1 x 600 kW

approx. 50% solid manure

Biogas plant Dahlenburg
City: Dahlenburg
Since: 2007
Power: 3 x 500 kW

Satellite CHP unit, Heat use, Municipal utility company

Biogas plant Deblinghausen
City: Steyerberg
Since: 2013
Power: 2 x 400 kW

Direct commercialisation, Dried chicken faeces, Domestic heating grid

Biogas plant Exeler
City: Rheine
Since: 2015
Power: 2 x 530 kW 
1 x 250 kW

2017 upgrade from 780 kWel to 1.310 kWel

Biogas plant Götzberg
City: Henstedt
Since: 2007
Power: 1 x 549 kW

Dry fermentation, Heating of greenhouses and pig barns

Biogas plant Holterdorf
City: Melle
Since: 2010
Power: 2 x 190 kW

approx. 40% solid manure, Micro gas distribution system with satellite CHP unit in 600 m distance

Biogas plant Ihausen
City: Westerstede
Since: 2005
Power: 1 x 500 kW

The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel

Biogas plant Krukum (ATZ)
City: Melle
Since: 2010
Power: 2 x 370 kW 
1 x 210 kW 
1 x 150  kW 
2 x 400 kW 
3 x 530 kW

Micro gas distribution system with satellite CHP unit, District heating grid (heating school, open-air pool, church institutions), Wood carburettor

Biogas plant Linne
City: Bissendorf
Since: 2009
Power: 2 x 190 kW

Connection of barns and existing manure storages for input supply to the biogas plant, The biogas plant is almost solely operated with slurry.

Biogas plant Lünen
City: Lünen
Since: 2009
Power: 10 x 250 kW

Micro gas distribution system (length 6,5 km), 10 satellite-CHP units with 250 kWel each, enamelled Steel tanks, Operated by municipal utility company

Biogas plant Nonantola
City: Nonantola
Since: 2013
Power: 1 x 1000 kW
Biogas plant Randkanal Nord
City: Köln
Since: 2012
Power: 1 x 1.200 kW

Operated by utility company, Heat use

Biogas plant Redefin
City: Redefin
Since: 2008
Power: 2 x 250 kW 
1 x 550 kW 
3 x 630 kW

Micro gas distribution system (17km), approx. 30% solid manure

Biogas plant Schuby
City: Schuby
Since: 2004
Power: 2 x 500 kW 
2 x 549 kW
2 x 904 kW

Installation of an innovative mixing technology for homogenising slurry and energy crops before feeding the fermenter (Quickmix®), 2016 upgrade from 1.000 kWel to 3.906 kWel

Biogas plant Vettweiß
City: Vettweiß
Since: 2011
Power: 1 x 370 kW 
1x 530 kW 
700 Nm³ 

Gas feed-in plant, Fermentation of sugar beets

Biogas plant Vinni
City: Lääne-Virumaa
Since: 2012
Power: 1 x 526 kW 
1 x 844 kW

Reference overview of biogas

Sort by clicking the headline

PlantCitySincePowerDescription
1Biogas plant Ahe27616 Kirchwistedt20123800./2 x 1500 kW
1 x 800 kW
2Biogas plant Ahnikov9999900670067CZ - 43001 Malkov2013600./1 x 600 kW

Waste processing plant

3Biogas plant Ahnikov Erw. (CZ)9999900840084Tschechien - 430 0 Ahnikov20150./
4Biogas plant Altranft16259 Bad Freienwalde20101237./1 x 600 kW 
1 x 637 kW

2019 upgrade from 600 kWel to 1.237 kWel

5Biogas plant Ardestorf21614 Buxtehude2011526./2 x 250 kW
6Biogas plant Aschersleben06449 Aschersleben2011645./1 x 645 kW

Installation of our pre-fabricated technology module

7Biogas plant Auegas Harsefeld21698 Harsefeld2010750./1 x 500 kW
1 x 250 kW
8Biogas plant Bad Freienwalde16259 Bad Freienwalde20101187./1 x 550 kW 
1 x 637 kW

Technology module, 2018 upgrade from 550 kWel to 1.187 kWel

9Biogas plant Baljerdorf21730 Balje2012500./1 x 500 kW

Heating of farmstead and poultry barn, Pile foundation

10Biogas plant Barby9999900680068DE - 39249 Barby20180./

only final storrage tank with gas accumulator roof

11Biogas plant Barl32369 Rahden2010500./2 x 250 kW

Micro gas distribution system with satellite CHP unit, The input consists of 10% grass silage

12Biogas plant Bartolfelde37431 Bad Lauterberg2011720./1 x 220 kW
2 x 250 kW
13Biogas plant Barum21357 Barum2011370./1 x 370 kW
14Biogas plant Bawinkel49844 Bawinkel2013250./1 x 250 kW

Gas management system

15Biogas plant Behrendorf25850 Behrendorf2010250./1 x 250 kW

The input consists of 20% grass silage

16Biogas plant Beldorf25557 Beldorf2010380./1 x 380 kW

Digestate drying, The input consists of 10% grass silage

17Biogas plant Bellingen39579 Bellingen2011265./1 x 265 kW 
1 x 250 kW
18Biogas plant BERD 126892 Dörpum20111404./1 x 500 kW 
1 x 904 kW 

Heating of barns

2017 upgrade from 500 kWel to 1.404 kWel

19Biogas plant BERD 226892 Dörpen20121430./1 x 526 kW 
1 x 904 kW 

Heating of barns

2017 upgrade from 526 kWel to 1.430 kWel

20Biogas plant Berge14641 Berge2014530./1 x 530 kW
21Biogas plant Bergzow39307 Bergzow2009370./1 x 370 kW

Mixing tank and Hydrolysis

22Biogas plant Beringstedt25575 Beringstedt2010380./1 x 380 kW

The input consists of 5% grass silage

23Biogas plant Bersenbrück49593 Bersenbrück20121326./2 x 400 kW
1 x 526 kW
24Biogas plant Bovinzoo (IT)9999900730073I - 47030 Borghi (FC)2015190./1x190kW
25Biogas plant Braderup25923 Braderup2005906./1 x 526 kW 
2 x 190 kW

Heating of pig barns and several homes, 2009 upgrade to 716 kWel, 2010 upgrade to 906

26Biogas plant Brekling24881 Nübel2007500./1 x 500 kW

Heating of homes and barns, Dry fermentation

27Biogas plant Brocklesby9999900710071GB - Brough20173395./1 x 1.067 kW 
2 x 637 kW 
2 x 527 kW

Waste processing plant

28Biogas plant Bukovec9999900670067CZ - 34562 Holýšov2009600./1 x 600 kW

approx. 50% solid manure

29Biogas plant Bunsoh25767 Bunsoh2010250./1 x 250 kW

The input consists of 5% grass silage

30Biogas plant Burow17089 Burow2010716./1 x 716 kW

Use of a Hammermill

31Biogas plant Campegine9999900730073I - 42040 Campegine2013250./1 x 250 kW
32Biogas plant Castelleone 19999900730073I - 26012 Castelleone2012250./1 x 250 kW
33Biogas plant Castelleone 29999900730073I - 26010 Fiesco2012250./1 x 250 kW
34Biogas plant Chichester9999900710071GB - Funtington20171800./2 x 900 kW

Pasteurization system, Economizer

35Biogas plant Christinenthal25593 Christinenthal2010250./1 x 250 kW
36Biogas plant Clapton9999900710071GB - Somerset2014526./1 x 526 kW
37Biogas plant Copella9999900850085UK - Suffolk20141249./1 x 499 kW 
1 x 250 kW 
1 x 500 kW

2015 upgrade from 499 kWel to 749 kWel

2019 upgrade from 749 kWel to 1.249 kWel

38Biogas plant Cremlingen38162 Cremlingen20121304./1 x 600 kW 
1 x 704 kW

Wood drying

2017 upgrade from 600 kWel to 1.304 kWel

39Biogas plant Dahlenburg21368 Dahlenburg20071500./3 x 500 kW

Satellite CHP unit, Heat use, Municipal utility company

40Biogas plant Deblinghausen31595 Steyerberg2013800./2 x 400 kW
41Biogas plant Deinste21717 Fredenbeck-Deinste20111470./1 x 370 kW 
3 x 190 kW 
1 x 530 kW

Heating of barns and homes, heat grid

2018 upgrade from 940 kWel to 1.470 kWel

42Biogas plant Deister31848 Bad Münder20111076./ 1 x 526 kW 
1 x 550 kW 

2017 upgrade from 526 kWel to 1076 kWel

43Biogas plant Divjumi (LV)9999900760076Lettland - 3022 Jelgavas novads2015600./1 x 600 kW
44Biogas plant Dörpum25821 Bordelum20071526./1 x 625 kW 
901 kW

Heating of barns and homes, Joint operation by 8 farmers

2019 upgrade from 625 kWel to 1.526 kWel

45Biogas plant Dörpum 225821 Bordelum2010500./2 x 250 kW

2011 upgrade to 500 kWel

46Biogas plant Dossow16909 Wittstock2012600./1 x 600 kW
47Biogas plant Dratum49326 Melle2008380./2 x 190 kW

Heating of farmstead and poultry barn

48Biogas plant Dretzen14793 Buckautal2011250./1 x 250 kW

digestate separation

49Biogas plant Drevec9999900670067CZ - 33141 Kožlany2012600./1 x 600 kW
50Biogas plant Drochtersen21706 Drochtersen2009537./1 x 537 kW

Installation of our pre-fabricated technology module

51Biogas plant Ebbinghof57392 Schmallenberg2009250./1 x 250 kW

Heat use in a hotel, Connection to existing heat grid operated with wood chip heating.

52Biogas plant Edincik9999900840084TR - 10640 Edincik20142134./1 x 2.134 kW
53Biogas plant Eitzte27446 Selsingen2014250./1 x 250 kW

The biogas plant is almost solely operated with slurry,

Heating of milking parlour and homes

54Biogas plant Ellingstedt42870 Ellingstedt20051100./1 x 500 kW 
1 x 600 kW

1017 upgrade from 500 kWel to 1100 kWel

55Biogas plant Elve48336 Sassenberg2010190./1 x 190 kW
56Biogas plant Embühren24819 Embühren2009370./1 x 370 kW
57Biogas plant Emsdetten48282 Emsdetten2013637./1 x 637 kW
58Biogas plant Energiepark Neuenwege26316 Varel2012860./1 x 220 kW 
1 x 190kW 
1 x 450 kW

The input consists of 10 % grass silage,

Gravity overflow, 2018 Extension of one digestate storage tank

59Biogas plant Esperstoft24887 Silberstedt2006500./1 x 500 kW
60Biogas plant Exeler48432 Rheine20151310./2 x 530 kW 
1 x 250 kW

2017 upgrade from 780 kWel to 1.310 kWel

61Biogas plant Falkenhain04808 Falkenhain2012265./1 x 265 kW
62Biogas plant Farsala9999900710071GR - 40300 Farsala20181487./1 x 1.487 kW
63Biogas plant Faulenhofe21730 Balje2012560./1 x 370 kW 
1 x 190 kW

Heating of chicken barns

64Biogas plant Finale Emilia9999900730073I - 41035 Finale Emilia2004250./1 x 250 kW

First biogas plant built in Italy

65Biogas plant Friedrichsau24855 Jübek2011600./1 x 600 kW

Digestate drying

66Biogas plant Füchtorf48336 Sassendorf2011250./1 x 250 kW
67Biogas plant Garze21354 Bleckede2009540./1 x 190 kW 
1 x 350 kW

Gravity overflow

2019 upgrade from 190 kWel to 540 kWel

68Biogas plant Goldelund25862 Goldelund2011869./1 x 499 kW 
1 x 370 kW
69Biogas plant Gonzaga (IT)9999900730073I - 46020 Palidano di Gonzaga (MN)2015265./1x265kW
70Biogas plant Götzberg24558 Henstedt2007549./1 x 549 kW

Dry fermentation, Heating of greenhouses and pig barns

71Biogas plant Grasberg28879 Grasberg2013515./1 x 250 kW 
1 x 265 kW
72Biogas plant Groß Bäbelin18292 Groß Bäbelin2002160./1 x 160 kW

Heating of homes, recreation rooms and pig barns

73Biogas plant Großenwiehe24969 Großenwiehe20081250./2 x 625 kW

Delivery of heat to the community and to a forwarding agency for cleaning tanks, Operation of a drying plant to reduce the amount of digestate

74Biogas plant Gültz17089 Gültz2011600./1 x 600 kW

Technology module

75Biogas plant Gut Böckel32289 Rödinghausen2010600./1 x 600 kW

Heating of an estate

76Biogas plant Gut Wiede31609 Balge2012400./2 x 400 kW

Heating of a school, 2018 upgrade from 400 kWel to 800 kWel

77Biogas plant Hahausen Extension38729 Hahausen2017530./1 x 530 kW

Extension of existing biogas plant by a CHP

78Biogas plant Hammrich26632 Ihlow2012650./1 x 250 kW 
1 x 400 kW

Gravity overflow, The input consists of 10% grass silage, Satellite CHP unit

79Biogas plant Hamweddel24816 Hamweddel2007625./1 x 625 kW
80Biogas plant Handrup 9999900680068Deutschland - 49383 Handrup2012265./1 x 265 kW
81Biogas plant Harsefeld21698 Harsefeld20111010./1 x 190 kW 
1 x 370 kW 
1 x 450 kW

2012 upgrade to 1.010 kWel

82Biogas plant Harsewinkel33428 Harsewinkel2012265./1 x 265 kW
83Biogas plant Havendorf26954 Nordenham2011370./1 x 370 kW 
1 x 530 kW

Use of a Hammermill, 2016 upgrade to 900 kW

84Biogas plant Heede9999900680068Deutschland - 26892 Heede, Kreis Emsland2012400./1 x 400 kW
85Biogas plant Heinersdorf15518 Steinhöfel OT Heinersdorf2015800./2 x 400 kW
86Biogas plant Heitzhausen9999900680068Deutschland - 27243 Winkelsett2013265./1 x 265 kW
87Biogas plant Het Haantje9999900780078NL - 7847 Het Haantje20096520./2 x 2.730 
1 x 1.060 kW

Power sale on the energy stock market, Load management, Digestate processing with ultra filtration

88Biogas plant Hingste27318 Hoya2012520./1 x 265 kW 
1 x 255 kW

Heat use by neighbouring industrial enterprises, 2016 upgrade from 265 kWel to 520 kWel

89Biogas plant Hödingen39356 Hödingen2014740./1 x 340 kW 
1 x 400 kW

2016 upgrade from 340 kWel to 740 kWel

90Biogas plant Hohengören39524 Hohengören2013265./1 x 265 kW 
1 x 350 kW

2018 upgrade from 265 kW to 615 kW

91Biogas plant Hohenziatz39291 Hohenziatz2010536./1 x 536 kW

Mixing tank

92Biogas plant Hohenziatz 29999900680068DE - 39291 Möckern-Lütgenziatz 2018800./2 x 400 kW
93Biogas plant Holte31613 Wietzen2012776./1 x 250 kW 
1 x 526 kW

Heat use by Wiesenhof company

94Biogas plant Holterdorf49326 Melle2010380./2 x 190 kW

approx. 40% solid manure, Micro gas distribution system with satellite CHP unit in 600 m distance

95Biogas plant Holzhausen16866 Kyritz2010537./1 x 537 kW

Installation of our pre-fabricated technology module

96Biogas plant Horstedt25860 Horstedt2006500./1 x 500 kW

Separation of input material before the digestion,

Dry fermentation, Heating of barns and homes

97Biogas plant Hoxfeld46325 Borken20051100./1 x 1.100 kW

Waste processing plant, Vapourisation of feedstock for micro-gas turbine, Hydrolysis and hygienisation

98Biogas plant Hoya27318 Hoya2008500./1 x 500 kW

Production heat for neighbouring industrial enterprises

99Biogas plant Hroby9999900670067CZ - 39001 Tábor2014550./1 x 550 kW
100Biogas plant Hübitz06308 Hübitz2014500./2 x 250 kW

Digestate drying, Digestate separation

101Biogas plant Hunteburg49328 Bohmte-Hunteburg2013265./1 x 265 kW
102Biogas plant Hustädte49328 Melle2001250./1 x 250 kW

Plug-flow-fermenter with gas attached gas accumulator - PLC controlled with visualisation, Separate receiving hall, External desulphurisation in a cross-current process

103Biogas plant Ihausen26655 Westerstede2005500./1 x 500 kW

The input consists of 85% grass silage, digestate separation, 2007: upgrade from 190 kWel to 500 kWel

104Biogas plant Ihlowerfehn26632 Ihlowerfehn2006976./1 x 526 kW 
1 x 450 kW

Joint operation by farmer and BioConstruct, Supply of municipal property, Mono-fermentation of energy crops, 2011 upgrade to 976 kWel

105Biogas plant Imperial Park9999900710071GB - Middlesbrough20174988./3 x 1.487 kW 
1 x 527 kW

Waste processing plant

106Biogas plant Itzstedt23845 Itzstedt2009815./1 x 190 kW 
1 x 625 kW

Heat supply for a research centre by sattelite CHP unit

107Biogas plant Jeggeleben39624 Jeggeleben2013265./1 x 265 kW
108Biogas plant Jevenstedt24808 Jevenstedt2009370./1 x 370 kW
109Biogas plant Kaarßen19273 Amt Neuhaus20052840./2 x 1.420 kW

Production of manure concentrate by vapourising final feedstock , Complete use of thermal heat, Co-financing and operation of the plant by BioConstruct

110Biogas plant Kaarßen 219273 Kaarßen2014530./1 x 530 kW

geruchsdichtes Dach

111Biogas plant Kappeln24376 Kappeln20111034./1 x 190 kW 
1 x 844 kW

Micro gas distribution system with satellite CHP unit

112Biogas plant Karaman9999900840084TR - 70000 Karaman20151414./1 x 1.414 kW
113Biogas plant Karditsa9999900710071GR - 43300 Sofades / Karditsa2018500./1 x 500 kW
114Biogas plant Kent9999900710071GB - Chart Sutton, Maidstone2016250./1 x 250 kW
115Biogas plant Klecken21224 Rosengarten-Klecken2012500./1 x 350 kW 
1 x 150 kW

Heating of greenhouses, Satellite CHP unit

116Biogas plant Klein-Offenseth25365 Klein-Offenseth-Sparrieshoop20071151./1 x 526 kW 
1 x 625 kW

Micro-gas distribution system with satellite-CHP, Heating of greenhouses, 2007: upgrade from 526 kWel to 1,151 kWel

117Biogas plant Kleinburgwedel30938 Burgwedel2013920./2 x 460 kW
118Biogas plant Kleindemsin9999900680068DE - 39307 Kleindemsin2019880./1 x 530 kW 
1 x 350 kW

Satellite CHP

119Biogas plant Klostergut Loccum31547 Rehburg-Loccum2012780./1 x 400 kW 
2 x 190 kW
120Biogas plant Kolbow19300 Kolbow2012600./1 x 600 kW
121Biogas plant Krátošice9999900670067CZ - 39201 Sobeslav2013536./1 x 536 kW
122Biogas plant Kremmen16766 Kremmen20140./1 x 265 kW
123Biogas plant Krukum (ATZ)49328 Melle20101080./2 x 370 kW 
1 x 210 kW 
1 x 150  kW 
2 x 400 kW 
3 x 530 kW

 

124Biogas plant Labbeck47665 Sonsbeck2011255./1 x 255 kW

Gravity overflow, Dual-fuel CHP unit

 

125Biogas plant Lamelot9999900700070F - 18130 Vornay2017250./1 x 250kW
126Biogas plant Langenweddingen39171 Langenweddingen20140./1 x 220 kW
127Biogas plant Lebach66822 Lebach20121245./3 x 265 kW 
1 x 450 kW

Heating of a home and supply of municipal property (hospital, school centre)

128Biogas plant Leffincourt9999900700070FR - 08310 Machault2016500./2 x 250 kW

2017 upgrade from 250 kWel to 500 kWel

129Biogas plant Libur51147 Köln-Porz2008500./ 1 x 500 kW 
1 x 904 kW

Bulk goods drying, 2018 upgrade from 500 kWel to 1.404 kWel

130Biogas plant Linne49143 Bissendorf2009380./2 x 190 kW

Connection of barns and existing manure storages for input supply to the biogas plant, The biogas plant is almost solely operated with slurry.

131Biogas plant Loukovec9999900670067CZ - 29413 Chocnejovice20121000./1 x 400 kW 
1 x 600 kW

Heating of homes and barns

132Biogas plant Lünen44532 Lünen20092500./10 x 250 kW

Micro gas distribution system (length 6,5 km), 10 satellite-CHP units with 250 kWel each, enamelled Steel tanks, Operated by municipal utility company

133Biogas plant Lütjenwestedt25585 Lütjenwestedt2009370./1 x 370 kW
134Biogas plant Marren49699 Lindern2014250./1 x 250 kW
135Biogas plant Meden Vale9999900710071GB - Meden Vale, Mansfield, Nottinghamshire2016355./1 x 355 kW 
1.000Nm³

1.000 Nm³ gas feed-in plant

136Biogas plant Mirandola9999900730073I - 41037 Mirandola2012800./1 x 800 kW

Dry fermentation, Separation, Technology module

137Biogas plant Mirow17252 Mirow20141279./1 x 255 kW 
1 x 265 kW 
1 x 549 kW 
1 x 210 kW

2019 upgrade from 1.069 kWel to 1.279 kWel

138Biogas plant Mühlenweg25899 Klixbüll2011620./1 x 370 kW 
1 x 250 kW
139Biogas plant Neerstedt27801 Neerstedt2012716./1 x 190 kW 
1 x 526 kW
140Biogas plant Neese19300 Neese2009500./1 x 500 kW

Installation of our pre-fabricated technology module

141Biogas plant Neu Jabel19303 Woosmer20140./1 x 190 kW
142Biogas plant Neukammer 114641 Nauen20091074./2 x 537 kW

Modification and expansion of existing biogas plant from 537 kWel to 2 x 537 kWel, 2 km local heat grid to a local hospital

143Biogas plant Neukammer 214641 Nauen20112500./1 x 2.500 kW 
750Nm³
144Biogas plant Nonantola9999900730073I - 41015 Nonantola20131000./1 x 1000 kW
145Biogas plant Norderende24887 Silberstedt20111075./1 x 526 kW
1 x 549 kW

The input consists of 5% grass silage, 2017 upgrade from 526 kWel to 1075 kWel

146Biogas plant Nortorf24589 Schülp2010620./1 x 370 kW 
1 x 250 kW

Satellite CHP unit, Digestate drying

147Biogas plant Nutteln32369 Rahden2010250./1 x 250 kW

Heating system fort he supply of homes and crafts enterprises, Joint operation by farmer and BioConstruct

148Biogas plant Oehna14913 Niedergöhrsdorf2009537./1 x 537 kW

Operated by utility company, Installation of our pre-fabricated technology module, digestate separation (in planning)

149Biogas plant Oelde59302 Oelde20111290./4 x 190 kW 
1 x 530 kW

Micro gas distribution system with satellite CHP unit, 2012 upgrade from 570 kWel to 760 kWel,  2018 upgrade from 760 kWel to 1.290 kWel

150Biogas plant Oisu9999900690069EE - 7230 Väljaotsa küla,Türi vald 20131130./  1 x 1.130  kW
151Biogas plant Oster-Ohrstedt25885 Oster-Ohrstedt2010250./1 x 250 kW

The input consists of 15% grass silage

152Biogas plant Ostercadewisch21789 Wingst2011625./1 x 625 kW

Heating system fort he supply of a market garden

153Biogas plant Osterstedt25590 Osterstedt2009190./1 x 190 kW
154Biogas plant Ostuffeln59457 Werl2010250./1 x 250 kW

Heat use by residence of St. Josef der von Mellin foundation, The input consists of 5% grass silage

155Biogas plant Parey39317 Elbe-Parey2009250./1 x 250 kW

Mixing tank and Hydrolysis

156Biogas plant Pasel58840 Plettenberg2013250./1 x 250 kW
157Biogas plant Peckfitz9999900680068Deutschland - 39649 Peckfitz, Altmarkkreis Salzwedel2014265./1 x 265 kW
158Biogas plant Pleše 9999900670067CZ - 37821 Kardašova 2010537./1 x 537  kW

Fermenter und Nachgärer sind parallel über einen Feststoffeintrag beschickbar, Anmischgrube mit Entnahmestation, Vergärung von 5% Grassilage und 5% Festmistanteil

159Biogas plant Polenzko39264 Polenzko2008530./2 x 265 kW

Hydrolysis, Local heat grid to supply several homes, Dual-fuel CHP unit

160Biogas plant Ponzano9999900730073I - 31050 Ponzano Veneto201799./1 x 99 kW
161Biogas plant Potzwenden37136 Landolfshausen2014190./1 x 190 kW
162Biogas plant Randkanal Nord50769 Köln20121200./1 x 1.200 kW

Operated by utility company, Heat use

163Biogas plant Rapotin9999900670067CZ - 78814 Rapotin2016905./1 x 405 kW 
1 x 500 kW

Waste processing plant

164Biogas plant Redefin19230 Redefin20082940./2 x 250 kW 
1 x 550 kW 
3 x 630 kW

Micro gas distribution system (17km), approx. 30% solid manure, Dry fermentation, Joint operation

165Biogas plant Reesdorf14547 Reesdorf20140./1 x 250 kW
166Biogas plant Reetz14827 Wiesenburg OT Reetz2013930./1 x 400 kW 
1 x 530 kW

Reine Gülleanlage

2017 upgrade from 400 kWel to 930 kWe

167Biogas plant Reher25593 Reher2007625./1 x 625 kW
168Biogas plant Reichenbach09648 Kriebstein2008500./1 x 500 kW

Heating of homes and barns

169Biogas plant Remlingen Extension38319 Remlingen2017904./1 x 904 kW

2017 upgrade to 904 kWel

170Biogas plant Ribbeck14641 Nauen2010370./1 x 370 kW

Installation of our pre-fabricated technology module, Gravity overflow, digestate separation, Heat use (in planning)

171Biogas plant Rieste49597 Rieste2003520./1 x 520 kW

Waste processing plant, 2005: upgrade from 340 kWel to 520 kWel

172Biogas plant Rodewald31637 Rodewald2012500./2 x 250  kW
173Biogas plant Roscommon 9999900730073IE - Roscommon2017998./2 x 499 kW

Digestion of sewage sludge (biosolids), fats oils and greases and rumen content

Production of 1 MW electricity

174Biogas plant Rothemann36124 Eichenzell2010250./1 x 250 kW
175Biogas plant Ruhlsdorf14947 Nuthe-Urstromtal2014250./1 x 250 kW
176Biogas plant Salzwedel Biomethan BHKW29410 Salzwedel20122378./2 x 1.189 kW

2013 upgrade to 2.378 kWel

177Biogas plant Schlochtern9999900680068DE - 49326 Melle2018637./1 x 637 kW

CHP only

178Biogas plant Schöninghsdorf49767 Twist2010526./1 x 526 kW

Heating of broiler barns, Separation

179Biogas plant Schreiersort26434 Wangerland2011850./1 x 370 kw 
1 x 480 kW

Digestate drying, The input consists of 35% grass silage

180Biogas plant Schuby24850 Schuby20043906./2 x 500 kW 
2 x 549 kW
2 x 904 kW

Installation of an innovative mixing technology for homogenising slurry and energy crops before feeding the fermenter (Quickmix®), 2016 upgrade from 1.000 kWel to 3.906 kWel

181Biogas plant Schuby 224850 Schuby2007500./1 x 500 kW

Heating of barns and homes

182Biogas plant Schülp24813 Schülp2009620./1 x 370 kW 
1 x 250  kW
183Biogas plant Schwagstorf49179 Ostercappeln2010500./2 x 250 kW

2012 upgrade to 500 kWel

184Biogas plant Schwege49219 Glandorf2011500./2 x 250 kW

2019 upgrade from 250 kWel to 500 kWel

185Biogas plant Sechtem53332 Bornheim2007500./1 x 500 kW

Heating of a home and greenhouses

186Biogas plant Seeverns26969 Butjadingen2012750./1 x 250 kW 
1 x 500 kW

2012 upgrade to 750 kWel and digestate separation

187Biogas plant Siedenbollentin17089 Siedenbollentin2006500./1 x 500 kW

Heating of barn and farm building

188Biogas plant Siegersleben39365 Siegersleben2014845./1 x 180 kW 
1 x 250 kW 
1 x 400  kW
189Biogas plant Silberstedt24887 Silberstedt20071887./2 x 625 kW 
1 x 637 kW

2008: upgrade from 625 kWel to 1,250 kWel, 2012: upgrade from 1,250 kWel to 1,887 kWel, Drying wood chippings

190Biogas plant Sochos9999900710071GR - 57002 Sochos2016999./1 x 999 kW
191Biogas plant Solschen31241 Ilsede2017410./2 x 205 kW 
700 Nm³

700 Nm³ gas feed-in plant

192Biogas plant Sotterhausen06528 Sotterhausen2014800./2 x 400 kW
193Biogas plant Spradow32257 Bünde2014500./2 x 250 kW
194Biogas plant Springe31832 Springe20121050./2 x 525 kW

2018 Extension of one digestate storage tank

195Biogas plant Staffhorst27254 Staffhorst2010750./3 x 250 kW

2012 upgrade to 500 kWel

2013 upgrade to 750 kWel

196Biogas plant Staffordshire9999900710071GB - Staffordshire2016249./1 x 249 kW
197Biogas plant Stankov9999900670067CZ - 34561 Stankov2012550./1 x 550 kW
198Biogas plant Sterup24996 Sterup2010716./1 x 716 kW

Installation of our pre-fabricated technology module, The input consists of 5% grass silage

199Biogas plant Strasburger Landgesellschaft27432 Bevern20131064./1 x 265 kW 
1 x 250 kW 
1 x 549 kW

2017 upgrade from 515 kWel to 1.064 kWel

200Biogas plant Strohe27243 Colnrade2011560./1 x 560 kW

Micro gas distribution system with satellite CHP unit, Wood drying

201Biogas plant Strunkovice9999900670067CZ - 38301 Prachatice 2014550./1 x 550 kW
202Biogas plant Stumpenhausen31613 Wietzen2010500./1 x 500 kW
203Biogas plant Teesside9999900710071GB - Middlesbrough20155098./3 x 1487 kW 
1 x 637 kW

Waste processing plant

204Biogas plant Telford9999900710071GB - Telford, Shropshire2016499./1 x 499 kW
205Biogas plant Tespe21395 Tespe2009500./1 x 500 kW

Pile foundation for the tanks, Joint operation by farmer and BioConstruct, complete thermal utilisation through wood drying

206Biogas plant Tjuchem9999900780078NL - 9939 Tjuchem2011600./1 x 600 kW
207Biogas plant Tripkau19273 Amt Neuhaus2006716./1 x 716 kW

2007: upgrade from 500 kWel to 716 kWel, Since 2009: Local heat grid into town to supply several homes

208Biogas plant Usilov9999900670067CZ - 34506 Usilov2012600./1 x 600 kW
209Biogas plant Varl32269 Rhaden2010500./2 x 250 kW

2012 upgrade to 500 kWel

210Biogas plant Vettweiß52391 Vettweiß2011900./1 x 370 kW 
1x 530 kW 
700 Nm³ 

2018 upgrade from 370 kWel to 900 kWel

Biomethane injection of 700 Nm³

211Biogas plant Viadana9999900730073I - 46019 Viadana20131000./1 x 1.000 kW
212Biogas plant Vielank19303 Vielank2014780./1 x 530 kW 
1 x 250 kW
213Biogas plant Vinni9999900690069EE - 46601 Lääne-Virumaa20121370./1 x 526 kW 
1 x 844 kW
214Biogas plant Volkringhausen58802 Balve2009500./2 x 250 kW

Heating of homes and barns

215Biogas plant Vörden49434 Neuenkirchen-Vörden2010500./1 x 500 kW

Connection of barns for input supply to the biogas plant, The biogas plant is almost solely operated with slurry

216Biogas plant Výškov9999900670067CZ - 44001 Louny2013600./1 x 600 kW
217Biogas plant Waffensen27356 Rotenburg / Wümme20141173./1 x 536 kW 
1 x 637 kW

2016 upgrade from 536 kWel to 1173 kWel

218Biogas plant Wappingthorn Farm9999900710071GB - BN443 West Sussex2015499./1 x 499 kW
219Biogas plant Westerende26632 Ihlow2008500./1 x 500 kW

Dry fermentation

220Biogas plant Wetter49328 Melle2009190./1 x 190 kW

Wood drying

221Biogas plant Wietzen31613 Wietzen2006500./1 x 500 kW

Heating of barns and homes, Supply of municipal property, Dry fermentation

222Biogas plant Winnert25887 Winnert20062000./1 x 500 kW 
1 x 1.500 kW

Heating of barns and homes, 2018 upgrade from 500 kWel to 2.000 kWel

223Biogas plant Winzlar31547 Rehburg-Loccum2013250./1 x 250 kW
224Biogas plant Wissen Extension9999900680068Deutschland - 47652 Weeze2012526./1 x 526 kW
225Biogas plant Wittkiel24409 Stoltebüll2006791./1 x 526 
1 x 265 kW

Heating of pig barns and several holiday homes, Drying wood chippings, 2008: upgrade from 526 kWel to 791 kWel

226Biogas plant Wredenhagen9999900680068Deutschland - 17209 Wredenhagen2014800./1 x 800 kW
227Biogas plant Wremen27638 Samtgemeinde Wursten2007870./1 x 500 kW 
1 x 370 kW

Wood drying for pellet production

2017 upgrade from 500 kWel to 870 kWel

228Biogas plant Zabovresky9999900670067CZ - 25601 Benešov2013526./1 x 526 kW
229Biogas plant Zens9999900680068Deutschland - 39221 Zens20141790./1 x 889 kW 
1 x 901 kW

2018 upgrade from 889 kWel to 1.790 kWel