Place: Salzwedel Since: 2012 Capacity: 2,1 MWp

In mid-2012, an installation with an output of 2.1 MWp was able to be set up on a general contractor basis within only six weeks on the empty grounds of a former chemical works, which had been remediated at great cost for this purpose. bioconstruct managed and was...

read more