In mid-2012, an installation with an output of 2.1 MWp was able to be set up on a general contractor basis within only six weeks on the empty grounds of a former chemical works, which had been remediated at great cost for this purpose. bioconstruct managed and was responsible for all the earth work, the complex pile driving work and for mounting the modules, connecting them to the grid and commissioning. In addition, bioconstruct is not only the supplier of the photovoltaic installation, but also its owner and operator.
PV installation Fonte Cupa
Place: Gualdo Cattaneo (PG)
Since: 2011
Capacity: 650 kWp
read more
In the rolling hills of Umbria, bioconstruct set up a ready-to-use, ground-mounted photovoltaic installation in 2011. This was preceded by intense planning and project development with local partners. The commissioning of the installation, with 650 kWp of installed...