Referenzen

Biogas plant Exeler

Place: Rheine Since: 2015 Capacity: 2 x 530 kW; 1 x 250 kW
2017 upgrade from 780 kWel to 1.310 kWel

Andreas Exeler

Andreas Exeler

It was important to us from the day one that our biogas plant will be built by a regional supplier. This guarantees short response times and savings on travel costs. After visiting a BioConstruct biogas plant at a partner farm in East Westphalia, the decision was made immediately: We also wanted to operate a BioConstruct plant on our farm and have not regretted it since then!

The trust that the Exeler family put into us – bioconstruct – from the very beginning could and was not disappointed in the end! It was from the outset a well-designed and smoothly handled building site, not least because of the open and honest communication and handling between the client and us. Thus, larger interfaces such as the built on-site solid storage area, which, at the same time, provides space for the 100 m³ solid feeding system as well as the separation unit, or the connection and integration of the on-site pre-storage tank within the barn via a 200 m long pressure line, could be handled easily.

In order to feed the substrate mix which almost exclusively consists of solid materials without problems into the digesters, we decided to install a shredder unit prior to the liquid feeding pump, which was, at that time, newly introduced into the market by the manufacturer.

We recognized how passionate the Exeler family operated their agricultural business as well as their biogas plant, when, in 2017, we were contracted to expand their plant with two additional combined heat and power units to allow flexible operation. Such well-maintained plants and farms are not a matter of course.

Andreas Exeler

Andreas Exeler

It was important to us from the day one that our biogas plant will be built by a regional supplier. This guarantees short response times and savings on travel costs. After visiting a BioConstruct biogas plant at a partner farm in East Westphalia, the decision was made immediately: We also wanted to operate a BioConstruct plant on our farm and have not regretted it since then!

More biogas plants

Biogas plant Saumur

Biogas plant Saumur

Place: Saumur Since: 2020

The biogas plant project "Saumur" was developed and is operated by the French company "Saumur Energie Vertes" in cooperation with “Agriopale Service” which is acting in the field of composting. bioconstruct was chosen for the delivery and installation of the whole...

read more
Biogas plant Charpentier

Biogas plant Charpentier

Place: Chailly-en-Brie Since: 2021

The biogas plant project "Charpentier" was developed and is operated by the French company "CPL Biogaz" especially by his managing director Baptiste Charpentier who is active in the field of agricultural production and logistics . BioConstruct was chosen for the...

read more
Biogas plant Vinni

Biogas plant Vinni

Place: Lääne-Virumaa Since: 2012 Capacity: 1 x 526 kW; 1 x 844 kW

And we are proud to have created this "lighthouse project" for the Baltic countries.  It's worth it to stay on the ball till the end. In the process, the biggest challenges for us were of a technical nature. For example, temperatures of -25° C were not uncommon in the...

read more