Thank you, Mr. Brüggemeyer.

Yes, the high percentage of solid manure was indeed a challenge, but hey – anybody can do corn and slurry. We’re glad we could prove once again that whatever your preferred substrates are – we can build a suitable biogas plant.

The Holterdorf plant went online in 2010 with a power output of two times 190 kW. One of the two CHP units is situated 600 m away, where the heat output is used by a paint shop. Its drying cabins must be kept at a constant temperature of 65° C. By implementing this satellite cogeneration unit we were able to lower the paint shop’s heating costs by 25% while reducing CO2 emissions – meanding economics and ecology go hand in hand.